Shiloh Missionary Baptist Church              
               
   Port Allen, Louisiana 950 7th St. 70767
                                         

 

2020 - 2022Church Repair Projects:

 List of Completed Maintenance Items and Items Left To Complete 

Photos - Repair Projects In Progress

Photos - Completed Repairs and Landscaping Feb. 11, 2021

 

The Landscaping of the church flowerbeds and other areas around the church has been completed.

 The 20 panel LED lights in tthe ceiling of the Sanctuary have been replaced. (March 2022)

 

During the past 15 months, we have completed several items. We added 4 outside GFI electrical connection boxes. Five new entry-way lights were replaced with new LED light fixtures. All back hallway lights were converted to LED fixtures and the main office and the main entry foyer lights were converted to LED lighting. One new pulpit receptacle was added.

Outside projects that have been completed; the bottom of the Bell Tower has been repaired and the rotten wood replaced and painted. All outside entry doors have been painted. The eves and soffit on the West side of the church have been repaired and painted.

The Men's Room privacy partitions have been installed. the walls and ceiling has been repainted. The Baptismal Pool has been repainted. The upstairs fire door was replaced and the Fire Escape was cleaned and painted. A new ramp for the storage shed was constructed. The missing vinyl soffit was replaced above the classrooms on the South side of the building. The two remaining outside AC enclosures have been repaired, the gates will now open and close correctly. The two arches on the North and West sides of the church have been preserved and painted.

Broken floor tiles in the main rear hallway and kitchen has been repaired. Fence painting around the outside Air Conditioning units is complete. Blinds in the Kitchen, both rear restrooms and the main fellowship area have been replaced.

A new choir stand HVAC unit has been installed and is working great. A new chain link fence has been installed around the unit.

Broken Stained glass window pane replacement and repainting the stained glass windows will be done as soon as replacement materials can be located. the original pane material and colors are no longer available. We will come as close as we can to matching the old panes. Total replacement for 7 windows is too costly.

The Sanctuary light fixture replacement was not approved, but will be done later.

Kitchen and Hallway Broken tiles were replaced,. We had to use tiles in the kitchen that were a close match. We took tiles from the kitchen and used the good ones to match the hallway tiles.

The Trustee Board

 

 

Web master:  Oliver A. Holbert, Jr.